The ‘Brandy Bridge’ as it is commonly known, is actually, historically three separate bridges.
The ‘First Brandy Bridge’, commissioned by Anthony Hill, was built immediately below Brandy Bridge Junction in 1861, to carry the Plymouth Ironworks Tramway over the River Taff, Taff Vale Railway and Plymouth Railway. It was a square span in three sections; the main section was over the river and was about 80ft long, made up of two wrought iron plate-girders mounted on a masonry pier on the east side and a masonry abutment on the west.
After the closure of the Plymouth Ironworks in 1880, the bridge began to fall into disrepair, but was still used by pedestrians going to and from Abercanaid whilst a new bridge was being built 100 yards upstream.
Plans for the ‘Second Brandy Bridge’ had been discussed as early as 1857. In August of that year, a committee, consisting of among others Robert Thompson Crawshay, Anthony Hill & G T Clark was set up by the Local Board of Health to consider building a bridge across the Taff to Abercanaid, as up until then, the only pedestrian access to the village was via a ford called the Plymouth Crossing.
By 1870 however, a bridge still hadn’t been built, much to the understandable exasperation of the population of Abercanaid. On 22 January 1870, the villagers held a public meeting where a proposition was made that “the first and surest way to obtain a bridge and a road to Abercanaid is by memorialising the Local Board of Health, and that this meeting has great confidence in the present Board that they will take prompt and active measures to obtain for us – a bridge”.
By 6 August the committee had investigated several sites but were all vetoed due to expense, until a site, at the old Plymouth Crossing was agreed upon. The total price for the new bridge was estimated to be between £400 and £500, and the committee approached the Taff Valley Railway Company for a contribution. The committee had not, however, prepared for the ensuing pettiness and inflexibility of the various landowners affected by the building of a new bridge and road.
It would be 10 years before the petty wrangling had been ironed out, and on 7 August 1880, the Local Board of Health, following an interview with the Taff Vale Railway Company, who were planning to expand their network, estimated that a new bridge would cost £1,600, with the railway company offering £600 towards the project. Further disagreements followed with the committee for the building of the bridge insisting that the Taff Valley Railway Company should pay a higher percentage of the cost.
The negotiations continued for two years until an agreement was finally reached, and it wasn’t until 1883 that work finally began on the bridge.
Samuel Harpur, Engineer and Surveyor of the Local Board of Health, was put in charge of the construction of the new bridge, and a contract was given to J Jones to deal with the excavation and stonework. The construction of the bridge itself was entrusted to The Cleveland Bridge and Engineering Company of Darlington who designed, built and erected the bridge which was 12 foot wide and made of steel lattice-work girders and steel cross-members. The bridge was opened late in 1883.
To be continued…..